Determine the size and construction of power distribution room, first determine the function of distribution room (with transformer and switching stations to use, control, multi-function), followed by the decision to set up places. From economic considerations, the installation location of hope in the load center. air circuit breaker the decision in the main device architecture utilize the remaining space can be obtained thereby substantially architectural design, but also to the construction requires detailed configuration diagram of the Figure to be recognized by the electrical engineer. After completion of electric meter of the building plans can, for large Air circuit breaker room should always check.
Buried in the concrete foundation construction grounding should saw the opportunity. Part of the building power distribution room should be completed in conjunction with acceptance, then continue until the final completion of the auxiliary construction.