From the planning to the completion of the power distribution room, roughly as follows: Determine the size, structure; decided to set up lAir circuit breaker detailed construction; inspection, circuit breakers architectural drawings; construction; completion of construction and acceptance; distribution room equipment construction, such as lighting, air conditioning, fire alarm, etc.; final acceptance.
Substation should be designed Electric energy meter project development plan, so far, the recent combination of the recent main, correctly handle the recent construction and long-term development of the relationship may be appropriate to consider expansion. Substation must be designed from the overall situation, balanced, according to the nature of the load, electricity capacity, the engineering characteristics of regional energy supply conditions and the requirements of environmental protection into account to determine design.