Power transformer is a static electrical equipment, is used to a certain value of the AC voltage (current) becomes the same frequency as the other one or more different voltage values (current) device.
2014年1月19日星期日
When charging the transformer should put all protection, and to ensure there is sufficient sensitivity
When charging the transformer should put all protection , and to ensure there is sufficient sensitivity , taking into account the impact of inrush current protection system . To ensure the stability of the system , if necessary, reduce the charge should be preceded by the relevant line of active power. Large current grounding system before charging or transformer outage must be neutral grounding blade closed. After charging , check the supply voltage, so that each side of the voltage transformer does not exceed 5% of the corresponding tap voltage . When the transformer into operation , should be less affected side of the inrush current power transmission . Generally start charging power supply side , after closing the load side switch. When a power outage , you should pull the load side of the switch, pull the power supply side of the switch. If 220kV transformers high and low pressure
mcb circuit breaker , when power by charging high side and low pressure side of the tie should be on the low side splitting power outage . When the ring transformer operating system , you should select the correct charging terminal to reduce the voltage difference tied at . When the transformer parallel operation , shall comply with the conditions of parallel operation . Transformers stop, when an impact
power transformers as when the power would run the system transformer neutral grounding , protection must be adjusted according to the requirements of operating procedures in the adjustment process, should be fit after pulling principles. For stop after power operation in hot standby transformer neutral point grounding blade should close the state.
订阅:
博文评论 (Atom)
没有评论:
发表评论